Logo — PRESTIGE
PRESTIGE / Investment powders / SPARKLEPrecision begins with preparation.

Stone-in-place investment

SPARKLE™

For stone-in-place
casting and wax setting.

A pre-blended investment for wax-set jewelry. Special anti-oxidizing ingredients help protect stone surfaces while preserving fine casting detail.

Calculate your mix
SPARKLE — PRESTIGE
  • 22.5 kg Plastic-lined poly sack
  • 22.5 kg Heavy-duty reusable plastic drum
  • 45 kg Heavy-duty reusable plastic drum

The reusable drums can also provide containment for used investment.

Investment typeGypsum bonded
Special applicationStone in place · Wax setting
Standard burnout cycle610°C peak · 7-hour hold
SPARKLE – Made for stones. Built for detail — PRESTIGE
Stone in place · Detail, protected.

01 / The SPARKLE difference

Made for stones.
Built for detail.

SPARKLE is a special-application gypsum bonded investment developed for stone-in-place casting. Its pre-blended anti-oxidizing ingredients form a protective heat barrier to help limit clouding or burning of suitable stones during burnout and casting.

  1. Protection for stones set in wax.

  2. A smooth mix. A strong mold.

  3. Versatility beyond the setting.

Gold up to 22K · Sterling & fine silver · Brass · BronzePre-blended protection · Compatible with common jewelry waxes

PREPARE YOUR BATCH

Your mix.
Calculated.

Catalog range: 38–40%. Additional setting: 37%.

Choose your water ratio
kg

Enter the weight of dry powder.

WATER REQUIRED
0.38 liters

1 kg powder × 0.38 = water in liters
100 parts powder : 38 parts water

Water 21–24°CWorking time 8 min
  1. 01

    Weigh & prepare

    Measure the calculated water at 21–24°C and weigh your SPARKLE powder.

  2. 02

    Add powder to water

    Always add powder to the measured water, in that order.

  3. 03 · 4–5 MIN

    Mix under vacuum

    Mix and vacuum together for 4–5 minutes.

  4. 04 · 2 MIN

    Pour into the flask

    Fill the prepared flask within 2 minutes.

  5. 05 · 1 MIN

    Vacuum the flask

    Vacuum the filled flask for 1 minute.

  6. 06 · 90–120 MIN

    Leave undisturbed

    Allow the flask to stand for 90–120 minutes before burnout.

Choose your water ratio. Ask our technical team ↗

03 / Recommended burnout cycle

A cycle made
for stone in place.

The standard SPARKLE program uses a 610°C peak and an extended seven-hour hold. Select a stage below to follow the cycle.

SPARKLE · STANDARD CYCLE13 hours to complete the peak hold

The time under each temperature is the hold at that temperature.

SPARKLE standard burnout program Ramp to 150 degrees Celsius in 1 hour, hold for 3 hours. Ramp from 150 to 610 degrees Celsius in 2 hours, hold at 610 for 7 hours. Then cool to the required flask temperature for casting. Thirteen hours to complete the peak hold. The cooling segment is schematic; no cooling time or final casting temperature is specified. 8006004002000°C014613TIME IN HOURS 150 °C3 h610 °C7 h

Swipe the chart to see the complete program →

Injection wax
Target temperatureTime to reach targetHold at target
150 °C
610 °C

Cooling: no fixed duration is specified; follow the temperature required by your casting process.

150°C → 610°C · 7-hour peak hold. The dashed cooling line is illustrative; the final temperature depends on your casting process.

Standard SPARKLE cycle · Stone compatibility & technical support ↗

Your next casting

Let’s make every
detail count.

Discuss SPARKLE, your casting process or your next order with the PRESTIGE team.

+90 212 674 81 47

PRESTIGE / SPARKLE

Let’s talk about SPARKLE.

Tell our team about your casting process or your next order.

We’ll use your details to respond to your inquiry.

Open in email app chris@certus-int.com

Prefer email? chris@certus-int.com

Contact us

Choose your language

Select a language. You will stay on this page.

EnglishРусскийEspañolDeutsch简体中文ItalianoالعربيةBahasa Indonesiaहिन्दीTürkçePortuguês (Portugal)ไทยFrançaisاردوفارسیO‘zbekchaTiếng ViệtPortuguês (Brasil)